Tuesday, September 15, 2009

More from on high

Work continues at the top of the grain elevator. On Monday morning a worker was up clinging to the pipe and doing something that was necessary.
They add two or three of these pipes (I am not sure what the proper term is) each day.

No comments:

Post a Comment

I have been getting too much spam lately so comments are now moderated and spam is deleted.