Last week I saw work being done behind the building shown below but I did not stop to ask what was happening. I am sorry I did not. Today the painted windows announced that we will be getting a taste of DeMotte in downtown Rensselaer, a Demotte Carpet store. Peeking inside, it looks like they have a lot of work left to do.
Meanwhile, on the other side of the block, the InkSaneBarn tattoo place is gone, It opened in April.
Crushed stone has been spread by one of Vision Ag's structures on Walnut Street. It looks like it is for parking.
On the other side of Walnut Street, the winter was hard on an old shed. The lot is for sale and the garage in the background has been used by Talbert.
The Dollar General building on SR 114 looks finished but I have not seen any indication when it will open. This morning a sprinkler system to water the grass was being installed and that was the only work being done.
No comments:
Post a Comment
I have been getting too much spam lately so comments are now moderated and spam is deleted.