Tuesday, September 15, 2009
More from on high
Work continues at the top of the grain elevator. On Monday morning a worker was up clinging to the pipe and doing something that was necessary.
They add two or three of these pipes (I am not sure what the proper term is) each day.
They add two or three of these pipes (I am not sure what the proper term is) each day.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment